Modular data-center infrastructure

NEURA INFRA / Infrastructure reference

NEURA STACK

Power, cooling, IT and supporting infrastructure — standardized modular blocks that stack and combine to scale capacity, engineered following NVIDIA's published reference architectures. Where NEURA POD is a single container-sized module, NEURA STACK stacks up block by block.

Discuss your project

Official NVIDIA reference / DSX AI Factory Platform

Coordinate the whole infrastructure stack.

NVIDIA DSX brings design, simulation and operations together across grid power, facilities, compute and infrastructure software. These published principles inform NEURA STACK’s modular approach; physical stacking is NEURA’s concept, not an NVIDIA specification.

Read NVIDIA’s DSX overview (opens in a new tab)

NEURA STACK is a NEURA INFRA solution, not an NVIDIA product. Referencing NVIDIA architecture does not establish qualification or partnership. NVIDIA and DSX are trademarks or registered trademarks of NVIDIA Corporation.

01Modular Anatomy

What is a module, what is a skid, what is built on site.

A single block, approximately 5 MW of IT load. No one factory builds every component. Each numbered element is delivered by a specialist partner — power, cooling, IT, support — and integrated under one engineering and delivery standard. Hover or select a component to isolate it in the block.

Scroll diagram horizontally →

Isometric component map of a modular data center block: power yard, IT hall and plant yard© 2026 Neura Infra — All rights reserved

Components

Colour key

PowerCoolingIT whitespaceSupport

Line routes

Power path: MV feed, riser and overhead buswayHeat path: facility water flow and returnSite-built wide-span shell

Power path

utility intake and MV switchyard → MV bus (generators stand behind the same bus) → transformer → e-house LV switchgear → UPS → overhead busway → rack PDU → server

Heat path

chip cold plate → technology cooling loop → CDU heat exchanger → facility water loop → cooling plant skid → plant yard headers → dry coolers → atmosphere. Water treatment holds loop chemistry and make-up volume.

Site-built scope is limited to the wide-span steel shell, foundations and the connections between blocks. Everything numbered above arrives as a factory-tested module or skid.

02Partner Ecosystem

Every block is sourced from a qualified specialist.

Infrastructure of this class is not built by one company. Each numbered block in the anatomy above is fabricated by a specialist qualified for that scope, then integrated against a single set of interfaces. Partners are referenced by capability and certification rather than by name.

Qualification gates — select to read

Partner identities, certificates and audit records are disclosed under NDA during technical qualification. No block is released to fabrication before its specialist has cleared every gate above.

03Industry Benchmark

Conventional vs. full modular delivery.

Indicative benchmark for investor and program planning. Figures are approximate and vary by location, scope, permitting, supply chain and design standard.

Time to IT-ready

Conventional

18–24 months

Modular

12–18 months

7–9 months earlier capacity

Total program incl. permitting

Conventional

30–35+ months

Modular

24–30 months

6–12 months faster to revenue

On-site MEP labour

Conventional

~12,000 hours/MW

Modular

~4,500 hours/MW

Approx. 63% reduction

Capex per MW

Conventional

~$14.6M

Modular

~$13.5M

Roughly 8% lower

White-space fit-out

Conventional

~15 weeks

Modular

2–3 weeks

Up to 80% faster

Licensed electrician hours

Conventional

High dependency

Modular

Up to 85% lower

Factory wiring, not site labour

This comparison is for illustrative purposes only and does not constitute a guaranteed project outcome. Actual schedule, labour, cost and deployment outcomes vary by geography, utility availability, site conditions and project scope. Comparison methodology and reference metrics based on research by Semi Analysis.